N2 - In this work, we are proposing a model that improves closed loop automatic controllers for real time processes, using only a positive function to deal with the process variations, no matter if they are positive or negative, the unit uses the sign to deal with the control output value. The first part of this document, gives an introduction to the kind of control systems that can be applied, and the reason to make this project. The second part gives the parameters to be used on the control model, as well as the signal conditioning stage. Then at third part, the design of the model is explained, followed by Results and conclusions at fourth and fifth parts respectively.
AB - In this work, we are proposing a model that improves closed loop automatic controllers for real time processes, using only a positive function to deal with the process variations, no matter if they are positive or negative, the unit uses the sign to deal with the control output value. The first part of this document, gives an introduction to the kind of control systems that can be applied, and the reason to make this project. The second part gives the parameters to be used on the control model, as well as the signal conditioning stage. Then at third part, the design of the model is explained, followed by Results and conclusions at fourth and fifth parts respectively.
KW - Actual value
KW - Error
KW - Process
KW - Reference value
UR - http://www.scopus.com/inward/record.url?scp=30844448579&partnerID=8YFLogxK
U2 - 10.1117/12.621555
DO - 10.1117/12.621555
M3 - Artículo de la conferencia
AN - SCOPUS:30844448579
SN - 0277-786X
VL - 5916
SP - 1
EP - 5
JO - Proceedings of SPIE - The International Society for Optical Engineering
JF - Proceedings of SPIE - The International Society for Optical Engineering
M1 - 59160O
T2 - Mathematical Methods in Pattern and Image Analysis
Y2 - 3 August 2005 through 4 August 2005
ER -