Access delay analysis of adaptive traffic load - Type protocols for S-ALOHA and CSMA in EDGE

Mario E. Rivero-Angeles, Domingo Lara-Rodríguez, Felipe A. Cruz-Pérez

Producción científica: Capítulo del libro/informe/acta de congresoContribución a la conferenciarevisión exhaustiva

6 Citas (Scopus)

Resumen

This article presents a mathematical analysis of the access delay in the adaptive traffic load (ATL) protocol. The basic idea of the ATL protocol is to limit the number of packet transmission for both new and backlogged users, in order to avoid collisions and keep the system stability. For this purpose, all users have an authorization probability to transmit which depends on the system traffic load. By using ATL protocol for high traffic loads, we maintain the throughput constant at its maximum value regardless of the traffic load of the system. Additionally in ATL, access delay is a linear function of the traffic load, meanwhile in conventional access protocols it is an exponential function. Additionally, we consider the EDGE (enhanced data for GSM evolution) frame structure and slot duration. EDGE is proposed as the evolution of TDMA based second generation networks to offer packet data transmission in order to provide the 3G services.

Idioma originalInglés
Título de la publicación alojada2003 IEEE Wireless Communications and Networking Conference, WCNC 2003
EditorialInstitute of Electrical and Electronics Engineers Inc.
Páginas1722-1727
Número de páginas6
ISBN (versión digital)0780377001
ISBN (versión impresa)9780780377004
DOI
EstadoPublicada - 2003
Publicado de forma externa
Evento2003 IEEE Wireless Communications and Networking Conference: The Dawn of Pervasive Communication, WCNC 2003 - New Orleans, Estados Unidos
Duración: 16 mar. 200320 mar. 2003

Serie de la publicación

NombreIEEE Wireless Communications and Networking Conference, WCNC
Volumen3
ISSN (versión impresa)1525-3511

Conferencia

Conferencia2003 IEEE Wireless Communications and Networking Conference: The Dawn of Pervasive Communication, WCNC 2003
País/TerritorioEstados Unidos
CiudadNew Orleans
Período16/03/0320/03/03

Huella

Profundice en los temas de investigación de 'Access delay analysis of adaptive traffic load - Type protocols for S-ALOHA and CSMA in EDGE'. En conjunto forman una huella única.

Citar esto