TY - GEN
T1 - Modeling and dynamic simulation of a salient-pole synchronous generator with eccentricity
AU - Ceron Guerrero, J. H.
AU - Olguin Salinas, D.
PY - 2010
Y1 - 2010
N2 - This paper presents the modeling and simulation of a salient-pole synchronous machine including static, dynamic or mixed eccentricity between stator and rotor. The generator is connected to an infinite bus bar and the abc reference frame is used to large disturbances angular stability studies, three-phase short circuit. The Modified Winding Function Method (MWFM) is employed to describe the machine windings and calculate the inductances of the generator. The permeance distribution is obtained by graphical determination of the field flux plot. Finally the calculated inductances are used to simulate the behavior of the generator under steady state operation, during a three-phase fault and after the fault clearance.
AB - This paper presents the modeling and simulation of a salient-pole synchronous machine including static, dynamic or mixed eccentricity between stator and rotor. The generator is connected to an infinite bus bar and the abc reference frame is used to large disturbances angular stability studies, three-phase short circuit. The Modified Winding Function Method (MWFM) is employed to describe the machine windings and calculate the inductances of the generator. The permeance distribution is obtained by graphical determination of the field flux plot. Finally the calculated inductances are used to simulate the behavior of the generator under steady state operation, during a three-phase fault and after the fault clearance.
UR - http://www.scopus.com/inward/record.url?scp=77957845789&partnerID=8YFLogxK
U2 - 10.1109/PQ.2010.5550011
DO - 10.1109/PQ.2010.5550011
M3 - Contribución a la conferencia
AN - SCOPUS:77957845789
SN - 9781424469796
T3 - PQ2010: 7th International Conference - 2010 Electric Power Quality and Supply Reliability, Conference Proceedings
SP - 99
EP - 104
BT - PQ2010
T2 - 7th International Conference - 2010 Electric Power Quality and Supply Reliability, PQ2010
Y2 - 16 June 2010 through 18 June 2010
ER -